Leveraging the national momentum of the Dual Carbon initiative, green manufacturing has become the mainstream trend across the industry.
Suiwa’s distributed photovoltaic project was successfully connected to the grid in February 2026. Covering an area of 2,500 square meters, the project adopts an integrated solar canopy design equipped with Huawei smart inverters and Aiko BC high-efficiency modules, operating on the model of self-consumption of generated power with surplus electricity fed into the grid.
Beyond cutting energy consumption and operational costs within the plant, the photovoltaic project enables the company to meet low-carbon procurement requirements of global customers and build differentiated competitive strengths.
Generating power from sunlight and advancing along a low-carbon path, Suiwa consistently fuels its long-term development with green energy.
